Watershed - South Fork Hay River (LC06)
South Fork Hay River Watershed

Details

The watershed drains gently rolling agricultural and wooded lands and features a number of cold water streams. Ths watershed contains eight Class I and 25 Class II trout streams. Fish surveys documented both brook and brown trout in the streams, however brook trout dominate the cold water fishery. Water resource problems documented during the appraisal include streambank erosion, sedimentation of riffle and pool areas, organic and nutrient loading from animal waste and elevated stream temperatures. The straightening of streams and beaver dams are detrimental to some streams in this watershed.

Date  1996

Ecological Landscapes for South Fork Hay River Watershed

Ecological Landscapes

The South Fork Hay River Watershed is located primarily in the Western Coulee and Ridges Ecological Landscape in southwestern and west central Wisconsin which is characterized by its highly eroded, driftless topography and relatively extensive forested landscape. Soils are silt loams (loess) and sandy loams over sandstone residuum over dolomite. Several large rivers including the Wisconsin, Mississippi, Chippewa, Kickapoo and Black flow through or border the Ecological Landscape. Historical vegetation consisted of southern hardwood forests, oak savanna, scattered prairies, and floodplain forests and marshes along the major rivers. With Euro-American settlement, most of the land on ridgetops and valley bottoms was cleared of oak savanna, prairie, and level forest for agriculture. The steep slopes between valley bottom and ridgetop, unsuitable for raising crops, grew into oak-dominated forests after the ubiquitous presettlement wildfires were suppressed. Current vegetation is a mix of forest (40%), agriculture, and grassland with some wetlands in the river valleys. The primary forest cover is oak-hickory (51%) dominated by oak species and shagbark hickory. Maple-basswood forests (28%), dominated by sugar maple, basswood and red maple, are common in areas that were not subjected to repeated presettlement wildfires. Bottomland hardwoods (10%) are common in the valley bottoms of major rivers and are dominated by silver maple, ashes, elms, cottonwood, and red maple. Relict conifer forests including white pine, hemlock and yellow birch are a rarer natural community in the cooler, steep, north slope microclimates.

Date  2010

South Fork Hay River Watershed At-a-Glance

Impaired Water in South Fork Hay River Watershed
River and Stream QualityAll Waters in Watershed

The South Fork of the Hay River watershed was selected in October, 1993, as a large-scale priority watershed project under the Wisconsin Nonpoint Source Water Pollution Abatement Program. A water resource appraisal initiated in March, 1994 and was completed in March, 1995. Monitoring consisted of fish surveys, macroinvertebrate sampling, temperature monitoring and habitat assessment. Water quality monitoring and a rooted aquatic plant survey were also conducted on Glen Lake.

Date  1996

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

Impaired Waters

List of Impaired Waters
Watershed Documents
Watershed Grants
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Shoreline Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings on 5 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2016
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Hlk-319 Match -Apple River Flowage Healthy Lakes Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Best practices will be designed and installed according to the Healthy Lakes fact sheets and technical guidance. Practices include: 350 ft2 native plantings on 4 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Healthy Lakes Native Plantings, Take 3: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Shoreline Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings on 5 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2016
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Hlk-319 Match -Apple River Flowage Healthy Lakes Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Best practices will be designed and installed according to the Healthy Lakes fact sheets and technical guidance. Practices include: 350 ft2 native plantings on 4 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Healthy Lakes Native Plantings, Take 3: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Balsam Lake
Status
Complete

Balsam Lake P & R District: Acq-Bass Bay Property Acquisition: The Balsam Lake Protection & Rehabilitation District is proposing to purchase a vacant lot on Balsam Lake in Polk County. The lot is located adjacent to property owned by the lake district. The long term intent for use of this property is to maintain the property in its natural condition and preserve natural shoreland habitat.

The property will be managed in accordance with the management plan contained in the project application. A deed restriction including the following language must be inserted in the deed:
By acceptance of this deed, the sponsor, for itself and its successors and assigns, hereby covenants and agrees not to sell, lease, assign or mortgage the premises herein described without the prior written approval of the Secretary of the Department of Natural Resources, his designee, or any successor and the rights herein conveyed are subject to the interests of the State under the lake management grant program, s. 281.69 & 281.71, Statues., and NR 191 Wis. Admin. Code.

Property Legal Description:
Lot 77, Park Addition in the Village of Balsam Lake, Polk County, Wisconsin.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Balsam Lake
Status
Complete

Balsam Lake P & R District: Acq-Stumps Bay Acquisition - Soltau Property: The Balsam Lake P&R District will purchase approximately 34 acres of property in the Stumps Bay area of Balsam Lake. The property is adjacent to property owned by the Lake District and will be maintained in a wild state and managed in accordance with the property management plan submitted with the lake protection grant application dated April 26, 2011.

The property will be managed in accordance with the management plan contained in the project application.

A deed restriction including the following language must be inserted in the deed:
By acceptance of this deed, the sponsor, for itself and its successors and assigns, hereby covenants and agrees not to sell, lease, assign or mortgage the premises herein described without the prior written approval of the Secretary of the Department of Natural Resources, his designee, or any successor and the rights herein conveyed are subject to the interests of the State under the lake management grant program, s. 281.69 & 281.71, Statues., and NR 191 Wis. Admin. Code.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Balsam Lake
Status
Complete

Balsam Lake P & R District: Hlk-Balsam Lake Native Plantings: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1995
Waters Involved
Bass Lake
Status
Complete

St. Croix County: Lco-Bass Lake Ordinance Enhansement - County Zoning Position: St. Croix County proposes to hire a half time staff person for five years who will be located in the County Zoning office and will perform the following zoning ordinance enhancement activities for the Bass Lake area:

1. Review and revise permits and other data gathering forms.
2. Review and revise permit issuance procedures.
3. Develop septic certification procedures for home additiond and improvements.
4. Assist the County/townships with developing and implementing tasks 1 - 3.
5. Assist the developing and implementing inspection and enforcement procedures; assist county and townships with implementation.
6. Assist the townships in improving record keeping methods in relation to land ownership changes and property development.
7. Identify and implement training needed for town and county regulators.
8. Assist with bringing sites with zoning violations into compliance with shoreland zoning regulations.
9. Assist in implementing recommendations that follow from the septic plume groundwater study.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bass Lake
Status
Complete

Bass Lake Rehabilitation District: Lmi-Bass Lake Management Plan Implementation: : Bass Lake Management District is sponsoring a Lake Management Planning Implementation project aimed at reducing phosphorus loads and protecting and improving diverse aquatic life through shoreland restoration projects and BMP installations.

Project activities include: Conduct site analysis and design for storm water runoff management, fisheries, and shoreland restoration practices. Provide technical assistance to develop designs and how-to information (DIY and/or landscapers). Establish and install BMP at demonstration sites. Promote installation of shoreland best management practices using demonstration sites as examples. Install 40 fish cribs.

Project deliverables: All data collected, a list and map of demonstration sites and fish cribs, before and after photos of restoration sites, individual site analysis reports, all outreach and event materials, agendas and minutes from advisory committee meetings.

Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Beaver Dam Lake
Status
Complete

Beaver Dam Lake Management District: Hlk-Beaver Dam Lake Fish Stick Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Beaver Dam Lake
Status
Complete

Beaver Dam Lake Management District: Lmi-Library Lake Soutwest Stormwater Wetland: The Beaver Dam Lake Management District is sponsoring a project to construct a storm water wetland facility. The project will also divert storm water away from Library Lake and into the wetland facility to treat the storm water.

Special conditions: Litter shall be removed from the project property and the shoreline it borders. The wetland pond shall be operated and maintained for a minimum of 25 years in accordance with the operation and maintenance plan, which must be approved by the Department. A contract will specify these approved plans and be filed with the Register of Deeds.

The final deliverables include a summary report that includes final design updates; pre/post site photos; copies of signed operation and maintenance plans and contracts, and educational materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. The grant sponsor shall submit all data, records, and reports, including GIS-based maps and digital images, to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Hlk-Healthy Lakes Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
7/1/2010
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Lmi-Bone Lake Comprehensive Plan Implementation: Bone Lake Management District will implement recommendations described in its comprehensive management plan including activities to reduce erosion; improve habitat and water quality; and expand lake protection/restoration marketing. Activities include: 1) design/build retention basins; 2) restore shorelines and integrate shoreline woody habitat; 3) implement residential diversion/infiltration best management practices (e.g. berms, rain gardens, rain barrels); 4) continue informational/educational outreach efforts, including implementing waterfront runoff marketing plan.

Shoreline restorations on properties using grant funds require a Department approved restrictive covenant permanently establishing the vegetative buffer on the parcel. Restorations will follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation occurs. Stormwater BMPs will have maintenance, operation, and protection plans specified in a ten-year contract for each site. The Department may perform site inspection and/or monitoring.

Project deliverables include: a report summarizing project activities describing accomplishments and challenges; final shoreline restoration plans/maps for grant funded implementation sites; pre/post photos of funded restorations; list of property owners and parcels committed to restrictive covenants or copies of signed covenants; educational materials developed.

Special conditions: project design plans and landowner contracts need approval before project begins; applicable water regulation permits must be issued before construction activities commence.

This scope summarizes the detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Lmi-Lake Management Plan Implementation: Bone Lake Management District is sponsoring a Lake Protection grant to implement activities from their approved lake management plan.

The specific project tasks include: 1) Design and install watershed BMPs; 2) Mini (10x35 foot) shoreline buffer restorations; 3) Design and install waterfront runoff projects; 4) ALUM dosage analysis; 5) Installation of woody habitat structures; 6) Establish Slow-No-Wake Ordinance; 7) Develop land protection strategy.

Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables include: a report and map summarizing project activities including number of shoreline buffers and watershed BMPs installed, number of runoff reduction sites installed, pre/post photos of funded restorations and other BMPs, list of property owners and parcels committed to covenants and/or contracts, alum dosage report, and educational materials developed.

Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Cedar Lake
Status
Complete

Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Df Study: Cedar Lake PRD proposes to contract with the U.S. Army Corps of Engineers to conduct a study of Phosphorus (P) loading within Cedar Lake in St. Croix County. Major project elements to include 1) sediment sampling and analysis, 2) water quality sampling and analysis, 3) algae collection and analysis, 4) Lake modeling, 5) study of phosphorus loading, 6) studies of aeration and alum treatment as means of controlling internal loading, 7) comprehensive watershed ag land use assessment, 8) Final report.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cedar Lake
Status
Complete

Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Alum: The Cedar Lake P&RD proposes to apply an initial Alum treatment to Cedar Lake in St. Croix County to reduce phosphorus loading from in-lake sediments, thereby reducing algal blooms and allowing for restoration of the lake's native plant community. Major project elements to include a) Initial alum treatment, b) monitoring, and c) final report.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Church Pine Lake
Status
Complete

Church Pine Round & Big Lake P & R District: Hlk-Church Pine, Round & Big Healthy Lakes 2017: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Deer Creek
Status
Complete

Deer Lake Conservancy Inc: Lmi-Runoff Control From Direct Drainage: Deer Lake Conservancy, Inc. proposes to install storm water best management practices to control direct drainage runoff. Specifically, the Conservancy will: 1) implement individual waterfront lot infiltration practices (rain gutters with drain tiles, infiltration pits, or rain gardens) on approximately 20 riparian lots; 2) design/build restoration of approximately 4 eroded gullies; 3) provide technical and financial assistance for traditional shoreline buffer restoration; 4) establish demonstration sites with open houses/tours of restoration/infiltration sites; and 5) coordinate education outreach and sociological surveys (in the form of focus groups) to determine barriers to participation and share benefits of the projects.

Special conditions: 1) Gully project design plans need approval before project begins; 2) applicable water regulation permits must be issued before construction activities commence; and 3) focus group script must be reviewed by statewide sociologist well in advance of first session.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Res-Deer Lake Blakeman/Hill Wetland Restoration, 1998-99: The Deer Lake Conservancy, Inc. proposes to restore a one half acre wetland on an intermittent stream in a small (211 acres) watershed that has been indentified by previous LMPG studies as contributing high phosphorus concentrations to Deer Lake. The wetland is located on the north side of Deer Lake. The wetland will be excavated to remove approximately five feet of accumulated sediments. The purpose of the project will be to restore open water habitat in this wetland, eliminate potential nutrient loading from the existing sediments, create habitat for ducks and other aquatic birds, and provide room for stormwater detention and settling of sediments and nutrients.

The Deer Lake Conservancy must comply with all regulations, restrictions, etc. that may be imposed on this project as a result of the water regulatory permit or authorization issued by the depoartment for this project. Water qualiy monitoring will be conducted on this waterway during and after the resoration project. The Deer Lake Conservancy, Inc. will provide the Department of Natural Resources with electronic and paper copies of the results of this monitoring and a final summary report on this project.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Acq-Flagstad Farm Preserve Acquisition: The Deer Lake Conservancy, Inc. has purchased a 70 acre parcel known as the Flagstad Farm Preserve. This lake protection grant is to be applied to the property including Lot 22 of the Assessor's Plat of Government Lot Seven (7), section 25, Township 34 North, Range 18 West Polk County and the northern 50 acres of the acquired property. The property includes 150 feet of frontage on Deer Lake and several wetlands in addition to upland. The property will be managed in accordance with the Property Management Plan, Flagstad Farm Preserve as outlined in the project description as attached to the Project Application (Form 8700-240) for this Lake Protection Grant.

A deed restriction including the following language must be inserted in the deed:
By acceptance of this deed, the sponsor, for itself and its successors and assigns, hereby covenants and agrees not to sell, lease, assign or mortgage the premises herein described without the prior written approval of the Secretary of the Department of Natural Resources, his designee, or any successor and the rights herein conveyed are subject to the interests of the State under the lake management grant program, s. 281.69 & 281.71, Statues., and NR 191 Wis. Admin. Code.

Property Legal Description:
The Northwest Quarter of the Northeast Quarter (NW 1/4-NE 1/4) except the South 400 feet, and East 30 Acres of the Northeast Quarter of the Northwest Quarter (NE \00BC-NW \00BC) except the South 400 feet, Section 36, Township 34 North, Range 18 West, EXCEPT parcels described in Volume 234 of Records, Page 135, Document Number 300256 and in Volume 234 Records, Page 138, Document 300259. And also including Lot 22 of the Assessor's Plat of Government Lot Seven (7), Section 25, Township 34 North, Range 18 West, Polk County, Wisconsin.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Acq-Flagstad Farm Back 20: The Deer Lake Conservancy, Inc. has a land contract for 20 acres around Deer Lake. The property will be managed in accordance with the Property Management Plan, Flagstad Farm Preserve as outlined in the project description as attached to the Project Application (Form 8700-240) for this Lake Protection Grant.

A deed restriction including the following language must be inserted in the deed:
By acceptance of this deed, the sponsor, for itself and its successors and assigns, hereby covenants and agrees not to sell, lease, assign or mortgage the premises herein described without the prior written approval of the Secretary of the Department of Natural Resources, his designee, or any successor and the rights herein conveyed are subject to the interests of the State under the lake management grant program, s. 281.69 & 281.71, Statues., and NR 191 Wis. Admin. Code.

Legal Description:
The South 400 feet of the Northwest Quarter of the Northeast Quarter (NW \00BC NE \00BC), and the East 30 acres of the Northeast Quarter of the Northwest Quarter (NE \00BC NW \00BC), Section 36, Township 34 North, Range 18 West, Polk County, Wisconsin, Except parcels described in Volume 234 of Records, Page 135, Document Number 300256 and in Volume 234 Records, Page 138, Document 300259, containing approximately 20 acres.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Lmi-Runoff Control From Direct Drainage: Deer Lake Conservancy, Inc. proposes to install storm water best management practices to control direct drainage runoff. Specifically, the Conservancy will: 1) implement individual waterfront lot infiltration practices (rain gutters with drain tiles, infiltration pits, or rain gardens) on approximately 20 riparian lots; 2) design/build restoration of approximately 4 eroded gullies; 3) provide technical and financial assistance for traditional shoreline buffer restoration; 4) establish demonstration sites with open houses/tours of restoration/infiltration sites; and 5) coordinate education outreach and sociological surveys (in the form of focus groups) to determine barriers to participation and share benefits of the projects.

Special conditions: 1) Gully project design plans need approval before project begins; 2) applicable water regulation permits must be issued before construction activities commence; and 3) focus group script must be reviewed by statewide sociologist well in advance of first session.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Lmi-Nearing The Goal: Deer Lake Watershed Phosphorus Reduction: Deer Lake Conservancy is sponsoring a project to design/build an iron/sand filter pond with pretreatment in a agriculture-dominated subwatershed (Watershed 1); continue the 2007 Direct Drainage best practices project to slow runoff and restore habitat; develop a land protection/conservation plan; promote community information and education. Watershed 1 pre-construction water quality data will be compared to post-construction data.

Special conditions: The iron/sand filter pond and pretreatment practices shall be operated and maintained for a minimum of 10 years in accordance with the operation and maintenance (O&M) plan, which must be approved by the Department. A contract will specify the approved plans and be filed with the Register of Deeds. All enrolled shoreline restoration parcels require a Department-approved restrictive covenant that permanently establishes the parcel vegetative buffer. Restorations will follow NR 191.24(3) standards unless mutually agreed to in writing with the regional lake coordinator before implementation. Runoff BMPs such as rain gardens and infiltration trenches will have maintenance, operation, and protection plans specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables: pre/post site photos of implemented practices; pond engineering/design plans; copies of O&M plans and contracts; final shoreline restoration plans/maps and copies of deed restrictions if implementation is funded by the Department; land protection plan; educational materials developed; project summary report including water quality data comparison.

This scope summarizes the detailed scope in the project application and does not supersede those application tasks/deliverables. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Acq-Johnson Preserve Acquisition: Deer Lake Conservancy is sponsoring a grant to help fund the fee title acquisition of the Johnson Preserve property which includes approximately 95 acres located in part of Section 25, in the Town of St. Croix Falls and part of Section 30 in the Town of Balsam Lake, Polk County.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Deer Lake
Status
Complete

Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Half Moon Lake
Status
Complete

Half Moon Lake Conservancy, Inc.: Acq-Tamarack Bay Rostvolt Acquisition: The Half Moon Lake Conservancy is sponsoring a project involving the acquisition of two lake lots totaling 31.5 acres and a conservation easment on 8.14 acres on Tamarack Bay of Half Moon Lake and inlcuding portions of Tamarack Creek, a tributary to Tamarack Bayall in the town of Milltown in Polk County. The acquistition is being donated in fee and easement to Half Moon Lake Conservancy Inc. Project funding will assist with project expenses associated with the baseline study, appraisal costs, and misc. legal and closing costs.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Harder Creek
Status
Complete

Half Moon Lake Conservancy, Inc.: Acq-Tamarack Bay Rostvolt Acquisition: The Half Moon Lake Conservancy is sponsoring a project involving the acquisition of two lake lots totaling 31.5 acres and a conservation easment on 8.14 acres on Tamarack Bay of Half Moon Lake and inlcuding portions of Tamarack Creek, a tributary to Tamarack Bayall in the town of Milltown in Polk County. The acquistition is being donated in fee and easement to Half Moon Lake Conservancy Inc. Project funding will assist with project expenses associated with the baseline study, appraisal costs, and misc. legal and closing costs.


Grant Details
Lake Protection Grant
Date
4/8/2005
Waters Involved
Hatfield Lake
Status
Complete

City Of New Richmond: Acq-Hatfield Lake Acquisition: The City of New Richmond proposes to purchase the 75.67 acre Carpenter Family parcel on Hatfield Lake in St. Croix County for Lake Protection purposes. Major project elements to include 1) acquisition costs and, 2) associated acquisition costs.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Hay River
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Library Lake
Status
Complete

City Of Cumberland: Acq-Library Lake - Neurer Acquisition: The City of Cumberland is sponsoring a land acquisition project to acquire a permanent limited easement on the Richard and Lorrain Neurer property.

This acquisition project is part of a mulit phase stormwater management project within the City. The Neurer easement is for the purpose of installing a stormwater best management practice on the eased property.

Special conditions for this project: the draft permanent limited easement must be reviewed by the Department prior to signing.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Library Lake
Status
Complete

Beaver Dam Lake Management District: Lmi-Library Lake Ne Stormwater Wetland: Beaver Dam Lake Management District in partnership with the City of Cumberland propose to design/build a stormwater pretreatment and wetland pond and restore shoreline on City-owned property along the NE shore of Library Lake and to promote public information and education, including local school district participation.

Special conditions: Litter should be removed from the project property and the shoreline it borders. The wetland pond shall be operated and maintained for a minimum of 10 years in accordance with the operation and maintenance plan, which must be approved by the Department. A contract will specify these approved plans and be filed with the Register of Deeds.

Project deliverables include: final shoreline restoration plans/maps if implementation is funded by the Department; pre/post site photo; wetland pond engineering/design plans and copies of operation and maintenance plans and contracts; educational materials developed and project summary report.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
7/1/2013
Waters Involved
Library Lake
Status
Complete

Beaver Dam Lake Management District: Acq-Southeast Library Lake Land Acquisition: The Beaver Dam Lake Management District is sponsoring a grant which will provide funding for a fee title land acquisition project iinvolving property on the southeast side of Library Lake. This acquisition is one of a number of acquisitions proposed to be used by the City of Cumberland for installation of a stormwater treatment facility. Ownership of the property will be transfered to the City of Cumberland.

Project activities include the acquisition of the property and associated closing activities; demonlition of the structure on the parcel to be acquired.



Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Library Lake
Status
Complete

Beaver Dam Lake Management District: Acq-Desantis Property Acquisition: The Beaver Dam Lake Management District is purchasing approximately 0.6 acres of property on the southwest side of Library Lake. The property will be used to treat stormwater runoff through the use of a wetland complex. The project is being done in cooperation with the City of Cumberland. The lake district will own the property and the City will maintain the stormwater facilities.

A legal description of the property is as follows:
GL 9-13, being part of Government Lot 9 described as part of residential lot 1, TP Stone's Oak Park Addition, beginning at a point on the south line of Elm Street along US Highway 63, 1120 feet west of west line of 2nd Street; thence west along Elm & 63 152 feet; thence south parallel to 2nd Street 172 feet; thence east 152 feet; thence north 172 feet to point of beginning. Except that part in SE-NW, Section 7 T35N, R13W described as beginning on the south line of Elm Street 1120 feet west of west line of 2nd Avenue; thence south to point 30 feet south of center line of Highway 63; thence west 132.5 feet parallel to said center line; thence north to south line of Elm Street; thence east to point of beginning, in the unplatted City of Cumberland, Barron County, Wisconsin.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Little Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Hlk-Healthy Lakes Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Long Lake
Status
Complete

Long Lake Prot & Rehab Dist: Lmi-Waterfront Projects Design & Installation And Alum Dosage Study: Long Lake P&R District is sponsoring a Lake Protection grant to protect and improve Long Lake water quality by designing and implementing shoreline restoration and runoff reduction practices. The project also includes an Alum dosage study.

Specific project tasks include: 1) Shoreline design/restoration on approximately 10 shoreline sites; 2) Design/installation of rain gardens, rock gardens, rock pits, and swales; 3) Alum dosage study.

Shoreline restorations will follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation occurs. Shoreline restorations using grant funding for plants or labor require a Department approved restrictive covenant that permanently establishes the vegetative buffer on the parcel. This project includes BMPs such as rain gardens and shoreline stabilization. Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables include: a report and map summarizing project activities, including documenting linear feet of shoreline stabilized, square feet of shoreline buffer restored, and number of runoff reduction sites installed; individual property shoreline restoration/stabilization plans/maps; pre/post photos of funded restorations; list of property owners and parcels committed to covenants and/or contracts; and Alum dosage report.

Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Lost Creek
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Hlk-Healthy Lakes Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
North Twin Lake
Status
Complete

City Of Amery: Lmi-Amery Lakes Management Plan Implementation: The City of Amery in partnership with the Amery Lakes District will develop a storm water management plan/ordinance and implement run-off control best management practices in priority (i.e. high nutrient load) sub-watersheds. Specifically, the City will: 1) update existing ordinances and develop a storm water management plan to reduce non-point source pollution; 2) design/build wetland basins and rain gardens at Soldier's Field; 3) design-build rain gardens at Flagpole Park; 4) select and install storm water control (e.g. rain gardens and barrels, shoreline buffers, porous pavement, and/or infiltration trenches) practices at demonstration sites within city limits; 5) develop example storm water education materials that will be applicable to other small cities; 6) inventory and measure in-lake habitat, including undeveloped shoreline and critical areas and develop plans for long-range protection and for measuring success of storm water control BMPs.

Special conditions:
* Project design plans need approval before project begins, and applicable water regulation permits must be issued before construction activities commence.
* Best management practices installed at Soldier's Field and Flagpole Park will be maintained for a minimum of 10 years.
* An operation and maintenance plan will be developed for care of the BMPs.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
1/27/1997
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Acq-St. Croix County Perch Lake Acquisition: St. Croix County shall participate in the Lake Protection Grant Program by purchasing approximately 67.05 acres of land in the Perch Lake watershed for lake protection purposes.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Acq-St. Croix County Perch Lake Acquisitioin Ii: St. Croix County will acquire 19.8 acres with all rights to land onPerch Lake that will expsnd it's day-use park called Homestead PArklands. The county purchase of the Onstott property will include 100 feet of shoreline at the north end of the property on Perch Lake.

268 feet of shoreline on Perch Lake at the south end of the Onstott property will be protected with the purchase of a conservation easement on 9.2 acres of the property. This prroperty will be referred to as the conservation easement.

These two acquisitions will protect an additional 368 feet of lake front giving more protection to Perch Lake and better management of the ecosystem.


Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Res-St. Croix Co Homestead Parklands On Perch Lake: St. Croix Co. proposes to construct a main park entrance road, one-way park access roads to and from Perch Lake, six parking areas and two infiltration basins. Grading and erosion control measures are designed to protect the water quality of Perch Lake.


Grant Details
Lake Protection Grant
Date
3/2/1994
Waters Involved
Pike Lake
Status
Complete

City Of Amery: Acq-Pike Lake - York Acquisition: The City of Amery will acquire approximately 32.7 acres of land along the northwest side of Pike Lake. Project costs include the cost of the parcel ($160,500) and the appraisal cost ($950).


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Pike Lake
Status
Complete

City Of Amery: Lmi-Amery Lakes Management Plan Implementation: The City of Amery in partnership with the Amery Lakes District will develop a storm water management plan/ordinance and implement run-off control best management practices in priority (i.e. high nutrient load) sub-watersheds. Specifically, the City will: 1) update existing ordinances and develop a storm water management plan to reduce non-point source pollution; 2) design/build wetland basins and rain gardens at Soldier's Field; 3) design-build rain gardens at Flagpole Park; 4) select and install storm water control (e.g. rain gardens and barrels, shoreline buffers, porous pavement, and/or infiltration trenches) practices at demonstration sites within city limits; 5) develop example storm water education materials that will be applicable to other small cities; 6) inventory and measure in-lake habitat, including undeveloped shoreline and critical areas and develop plans for long-range protection and for measuring success of storm water control BMPs.

Special conditions:
* Project design plans need approval before project begins, and applicable water regulation permits must be issued before construction activities commence.
* Best management practices installed at Soldier's Field and Flagpole Park will be maintained for a minimum of 10 years.
* An operation and maintenance plan will be developed for care of the BMPs.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Red Cedar River
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Rock Creek
Status
Complete

Deer Lake Conservancy Inc: Lmi-Runoff Control From Direct Drainage: Deer Lake Conservancy, Inc. proposes to install storm water best management practices to control direct drainage runoff. Specifically, the Conservancy will: 1) implement individual waterfront lot infiltration practices (rain gutters with drain tiles, infiltration pits, or rain gardens) on approximately 20 riparian lots; 2) design/build restoration of approximately 4 eroded gullies; 3) provide technical and financial assistance for traditional shoreline buffer restoration; 4) establish demonstration sites with open houses/tours of restoration/infiltration sites; and 5) coordinate education outreach and sociological surveys (in the form of focus groups) to determine barriers to participation and share benefits of the projects.

Special conditions: 1) Gully project design plans need approval before project begins; 2) applicable water regulation permits must be issued before construction activities commence; and 3) focus group script must be reviewed by statewide sociologist well in advance of first session.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Sand Creek
Status
Complete

Sand Lake Management District: Lmi-Sand Lake Wash Repair & Agricultural Bmp Project: Sand Lake Management District is sponsoring a Lake Protection grant to repair gulley erosion, provide agricultural BMP incentives, and monitor tributaries to document nutrient reductions.

The specific project tasks include: 1) NW Gulley Washout repair; 2) Agriculture BMP incentive payments; 3) Tributary and outlet water quality monitoring; 4) Field and lake BMP educational tours.

Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables include: annual summary reports and maps summarizing project activities including NW Gulley repair, categories and acres of agriculture BMP\2019s installed, copies of agriculture BMP contracts, stakeholder meeting agendas and minutes, water quality sampling results, and educational materials developed.

Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Sand Lake
Status
Complete

Sand Lake Management District: Lmi-Sand Lake Wash Repair & Agricultural Bmp Project: Sand Lake Management District is sponsoring a Lake Protection grant to repair gulley erosion, provide agricultural BMP incentives, and monitor tributaries to document nutrient reductions.

The specific project tasks include: 1) NW Gulley Washout repair; 2) Agriculture BMP incentive payments; 3) Tributary and outlet water quality monitoring; 4) Field and lake BMP educational tours.

Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables include: annual summary reports and maps summarizing project activities including NW Gulley repair, categories and acres of agriculture BMP\2019s installed, copies of agriculture BMP contracts, stakeholder meeting agendas and minutes, water quality sampling results, and educational materials developed.

Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete

Barron County: Lmi-Silver Lake Water Quality Diagnostic Feasibility Study: The Barron County Soil & Water Conservation Department, in cooperation with the US Geological Survey, Dept. of Nat. Res., and a private consultant, will conduct a comprehensive diagnostic/feasibility study of Silver Lake and it's watershed and develop a lake management plan.

The project includes the following objectives ( ) and activities [ ]; (1) Determination of the source(s) of pollutants that have caused recent reductions of water quality - [watershed assessment], [shoreline assessment], [complete water quality study], [develop hydrologic budget], [develop phosphorus budget], [develop groundwater model], [lake sediment core assessment], [shoreline septic systems assessment], [lake bacterial water quality assessment], and [an assessment of the feasibility of a water level control device], (2) Prediction of probable water quality responses to possible pollution reduction practices - [assessment of lake water quality responses utilizing acceptable computer "models"], (3) Protection of Silver Lake from invasive exotic aquatic species - [conduct aquatic plant survey to detect any exotic species], [recommend measures to prevent future exotic species infestations], (4) Evaluation of the fishery of Silver Lake - [Wis. DNR will conduct fishery survey and prepare report]

Project deliverables include a USGS water-resources investigations report, or equivalent document, a USGS fact sheet, or equivalent document, and a comprehensive lake management report for the Silver Lake system.

Conditions for this project include:
* The installation of stream and lake gauging stations must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the annual and final reports of the results of this study and the lake management plan. Project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Silver Lake
Status
Complete

Silver Lake Association: Lmi-Waterfront Lots Water Quality Improvements: Silver Lake Association is sponsoring a project to implement shoreline stabilization, restoration, runoff reduction, and wetland restoration practices.

Project tasks: 1) Design/stabilization on approximately 10 shoreline sites; 2) Shoreline restoration design technical assistance; 3) Design/installation on approximately 6 runoff reduction sites; 4) Install woody habitat improvement (Fish Sticks) on approximately 4 sites; 5) Design/implement wetland restoration; 6) Landscaper training/education.

Shoreline restorations using grant funding for plants or labor require a Department approved restrictive covenant to permanently establish the parcel vegetative buffer. Restorations will follow NR 191.24(3) standards unless mutually agreed to in writing with the DNR lake coordinator before implementation. BMPs such as rain gardens and shoreline stabilization must have maintenance, operation, and protection plans specified in a ten-year contract.

Project deliverables: report and map summarizing project activities, documenting linear feet of shoreline stabilized, square feet of shoreline buffer restored, number of Fish Stick sites with numbers of trees used, number of runoff reduction sites installed; individual property shoreline restoration/stabilization plans/maps; pre/post photos of funded restorations; list of property owners and parcels committed to covenants and/or contracts; and educational materials developed.

This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the DNR Lake Coordinator.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Sinking Creek
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Straight River
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Hlk-Healthy Lakes Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Tainter Lake
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Star Prairie Land Preservation Trust: Acq-Cedar Lake (Menke) Acquis. Costs: The Trust seeks $11,567 in reimbursement for costs associated with the acquisition (via donation) of 63 acres on Cedar Lake In St. Croix County.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Deer Lake Conservancy Inc: Lmi-Runoff Control From Direct Drainage: Deer Lake Conservancy, Inc. proposes to install storm water best management practices to control direct drainage runoff. Specifically, the Conservancy will: 1) implement individual waterfront lot infiltration practices (rain gutters with drain tiles, infiltration pits, or rain gardens) on approximately 20 riparian lots; 2) design/build restoration of approximately 4 eroded gullies; 3) provide technical and financial assistance for traditional shoreline buffer restoration; 4) establish demonstration sites with open houses/tours of restoration/infiltration sites; and 5) coordinate education outreach and sociological surveys (in the form of focus groups) to determine barriers to participation and share benefits of the projects.

Special conditions: 1) Gully project design plans need approval before project begins; 2) applicable water regulation permits must be issued before construction activities commence; and 3) focus group script must be reviewed by statewide sociologist well in advance of first session.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Beaver Dam Lake Management District: Hlk-Beaver Dam Lake Fish Stick Project: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Beaver Dam Lake Management District: Lmi-Library Lake Soutwest Stormwater Wetland: The Beaver Dam Lake Management District is sponsoring a project to construct a storm water wetland facility. The project will also divert storm water away from Library Lake and into the wetland facility to treat the storm water.

Special conditions: Litter shall be removed from the project property and the shoreline it borders. The wetland pond shall be operated and maintained for a minimum of 25 years in accordance with the operation and maintenance plan, which must be approved by the Department. A contract will specify these approved plans and be filed with the Register of Deeds.

The final deliverables include a summary report that includes final design updates; pre/post site photos; copies of signed operation and maintenance plans and contracts, and educational materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. The grant sponsor shall submit all data, records, and reports, including GIS-based maps and digital images, to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Whitefish Lake
Status
Complete

Whitefish Lake Conservation Organization, In: Res-Renewal & Retention Of Native Vegetation: The Whitefish Lake Property Owners Association, Inc. will implement a lakewide project to renew and protect vegetation that extends landward and lakeward from the ordinary high water mark of Whitefish Lake. This program will provide for an initial site evaluation/assissment of shoreline properities with the potential for shoreline renewal and /or protection of native vegetation. Cost sharing will be provided for site assessment and evaluation, site design for restoration, and preparation/planting of vegetation. Shallow water areas contiguous with renewal sites will be protected as a "no disturbance zone". The project goal is to renew native vegetation on 45 sites (1/2 of current development) and retain and protect native vegetation on the remaining sites. A$3,000 cost share cap will be implemented per individual renewal site. All properties participating in this program will receive a departmnet approved deed restriction that permanently establishes the vegetative buffer on the parcel. Shoreland restoration projects will be designed and installed in accordance with the NRCS Best Management Practices Definition and Conditions.

Participants in this program will post their property with signs and will allow other lakeshore owners to visit their property for educational purposes. Additional activities will include an information and education program involving Whitefish Lake residents, local and county governments, other lake associations, school children, and conservation groups.

Project deliverables include a final report listing project accomplishments including the number of parcels or lots participating in the program. The Department of Natural Resources will be provided with a paper copy and an electonic copy of all project products. Project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper article(s).


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Wind Lake
Status
Complete

Church Pine Round & Big Lake P & R District: Hlk-Church Pine, Round & Big Healthy Lakes 2017: Partnering with property owners, the applicant is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Beaver Creek
Status
Complete

St. Croix County: Glen Lake Map: The St. Croix Co. Parks Dept. proposes to contract for creation of a bathymetric map of Glen Lake in St. Croix Co. and a map of the surrounding region. Major project elements to include: 1) Data collection, 2) Map development, 3) Printing and distribution.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Glen Lake
Status
Complete

St. Croix County: Glen Lake Map: The St. Croix Co. Parks Dept. proposes to contract for creation of a bathymetric map of Glen Lake in St. Croix Co. and a map of the surrounding region. Major project elements to include: 1) Data collection, 2) Map development, 3) Printing and distribution.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
South Fork Hay River Watershed
Watershed Recommendations
Best Management Practices, Implement
Polk County Manure Storage Facility
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; and a waste transfer system.
1/1/2018
In Progress
Projects
Documents
 
Best Management Practices, Implement
Polk County Manure Storage Facility
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; a waste transfer system; and a milking center waste control systems.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Barron County NOD
Date
Status
This project was a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by 319.
8/16/2017
In Progress
Projects
 
Best Management Practices, Implement
Barron County NOD
Date
Status
This project was a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by 319.
8/16/2017
In Progress
Projects
 
Best Management Practices, Implement
St Croix Co Rush River Non-TMDL TRM
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system closure, access roads and cattle crossings, animal trails and walkways, critical area stabilization, grade stabilization, heavy use area protection, livestock fencing, livestock watering facilities, riparian buffers, sediment basins, water and sediment control basins, waterway systems, well decommissioning, wetland development or restoration, stream crossing, rip-rapping, shaping and seeding, and livestock fencing to remedy discharges of manure, sediment and phosphorus in runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
City of New Richmond Stormwater Pond Retro #265
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the municipality will construct/install a wet detention pond to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Coumbia County Manure Storage & Runoff Management
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the grantee will provide 90% cost-sharing to assist the farm in addressing the sources of runoff to an unnamed tributary of Cambra Creek cited in the Notice of Discharge.
5/1/2015
In Progress
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/8/2011
Proposed
Projects
 
Monitor Water Quality or Sediment
South Fork Hay River TP
Date
Status
Category 2. 2018 TP Results: May Exceed. Station: 10010864. AU: 15722.
1/1/2018
Proposed
Projects
 
Restore Wetlands
 
Date
Status
Wetland protection and restoration should continue for habitat conservation, wildlife production, and water quality improvements.
10/6/2010
Proposed
 
Stormwater Planning, Implementation
Hudson Storm Water Management and Master Planning
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, new storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, updated storm water financing mechanism, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
St. Joseph MS4 Planning
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: new construction erosion control ordinance, new storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
TMDL Development
Halfmoon Lake TMDL
Date
Status
Half Moon Lake (Hydrologic Unit Code 070500006) is a small, shallow eutrophic lake that formed as an oxbow of the Chippewa River. The lake is geographically located within the City of Eau Claire and the Lower Chippewa River Basin. The lake is highly eutrophic and exhibits excessive algae and aquatic macrophyte growth (Borman, 1990; Brakke, 1995; Konkel and Borman, 1996; James et. al., 2001, 2002).
7/1/2006
In Progress
Documents
 
TMDL Development
Cedar Lake TMDL
Date
Status
The Wisconsin Department of Natural Resources (WDNR) developed a TMDL for phosphorus for Cedar Lake. The TMDL addresses the nutrient impacts and impairments which were identified on the Wisconsin 2002 303(d) list. The Lake is nutrient (phosphorus (P)) impaired as a result of agriculture, internal loading and local land use. Water quality in Cedar Lake is generally poor to very poor, falling into the eutrophic to hypereutrophic category. Summer algal blooms result in foul odors and an unsightly build-up of algae biomass on the shoreline. In addition, trophic conditions in the lake limit rooting depth for emergent vegetation used by the resident fish populations. As a result, these impairments impact the recreational/aesthetic value of the lake and stress sport fish populations.
8/19/2003
In Progress
Projects
Documents
 
TMDL Implementation
Squaw Lake TMDL
Date
Status
This TMDL report is for Squaw Lake, located in the Star Prairie Township, St. Croix County, Wisconsin, in the St. Croix River Basin. The lake is geographically located across portions of Sections 8, 9 and 17 of T31N, R18W of the USGS Somerset North Quadrangle.
4/13/2011
In Progress
Projects
Documents
 
TMDL Monitoring
Half Moon Lake TMDL
Date
Status
Half Moon Lake (Hydrologic Unit Code 070500006) is a small, shallow eutrophic lake that formed as an oxbow of the Chippewa River. The lake is geographically located within the City of Eau Claire and the Lower Chippewa River Basin. The lake is highly eutrophic and exhibits excessive algae and aquatic macrophyte growth. Half Moon Lake was originally listed on Wisconsin?s 303(d) impaired waters list in 1998 for eutrophic conditions and sedimentation and listed as a high priority for TMDL development on the October 2002 303(d) list.
7/1/2006
In Progress
Projects
Documents
 
South Fork Hay River WatershedWatershed History Note